PJSC “ZAPORIZHSTAL” HAS PUT INTO OPERATION FAN WATER-COOLING TOWER OF WATER RECYCLING FOR THE BLAST FURNACES
PJSC «ZAPORIZHSTAL» CONNECTED GAS-CLEANING SYSTEM OF SINTER MACHINE NO.5 FOR RUNNING IN THE MODE OF PILOT OPERATION