The administrative building open-hearth furnace repair is completed the male showers. For these purposes plant sent about 900 thousand.
During the repair in the room installed modern plumbing and showers, damp-proof walls, stoned their new ceramic tiles. On the floor – as ceramic tiles, with a special anti-slip coating.
Reliable operation of the shower provide new drainage systems, water supply and ventilation systems. Fully updated and a bathroom adjacent to the shower. Overhaul conducted on a comprehensive program “Business Life”, which operates at the plant for three years.
– Create the best living conditions is one of the priorities of the plant, and the program “Work Life” – an effective tool for achieving this goal, – says HR Director Andrew Luchenko.