METALLURGISTS FROM IRAN HAD A LOOK AT REVAMPING OF BLAST FURNACE PRODUCTION FACILITIES AT “ZAPORIZHSTAL” PJSC

On the 4th of September, 2015, a delegation from Isfahan Iron & Steel Works (Iran) visited “Zaporizhstal” PJSC; it had a look at the current activity and revamping of the Works’ Blast Furnace Production.

Iran metallurgists met with the management of the Works and of Blast Furnace Shop as well as they visited the production sites including examining the Blast Furnace No.4 (BF-4), which was completely revamped in 2014. «I visited “Zaporizhstal” Works on repeated occasions, and I want to note that this enterprise is being consistently developed and worked out for the best», – a Consultant on Metallurgy at Isfahan Iron & Steel Works Mr. Sayed Muhammed Tahai said. – «I was greatly impressed by the revamped Blast Furnace No.4 – it became much more ecological and power-efficient».

Looking back, as of today, BF-4 – is one of the most modern and ecological Blast Furnaces in Ukraine. In the course of the grand-scale revamping, completed in 2014, this unit was equipped with a state-of-the-art dedusting systems at the cast yard and stock house, and it was transferred to Pulverized Coal Injection system. The investments into the revamping project of BF-4 made up about UAH 600 million.

Menu